The Marmaray project consists of 11 tubes, which placed together have a total length of 1.4 kılometers and which have been connected at a depth of 60 meters under the waters of the Bosporus. Erdoğan on Saturday pushed the button that removed the 11th section's covering and connected it to the other sections. Mentioning that they have connected both sides of İstanbul, Erdoğan said: " We have just brought both sides of the city together through the connection of the 11th section. We will be able to accomplish a project that was planned 148 years ago."

The railroad will be put into service in four years' time, and it is expected to decrease the chronic traffic congestion that afflicts İstanbul. " The traffic in İstanbul creates great stress every day," Erdoğan said, adding that congestion will be eased through the Marmaray project.

Stating that it will be possible to travel from London to Beijing through the Marmaray tunnels, Erdoğan said Europe and Asia are being connected with Marmaray. The prime minister also noted that they were completing the tender that will enable service vehicles with tires to travel into the tunnel from an access point close to the Marmaray line. " The details of the tender will be announced soon," he said.

After Marmaray starts service, it will take just 37 minutes to travel from Bakırköy to Bostancı. Also, the Marmaray rail line will have a connection to the already existing metro line from Taksim to 4. Levent, which will soon be extended to Maslak/Ayazağa. As a result of Marmaray, the amount of journeys within İstanbul which will be made by rail is expected to increase from 8 percent to 28 percent. Stating that they will maintain the target of increasing the length of divided highways to 15,000 kilometers within İstanbul, Erdoğan said they will add another 6,000 kilometers more of divided highways to the road network of İstanbul to reach this total.

The Marmaray project is estimated to be able to carry a peak of 75,000 passengers each hour from the Halkalı district of İstanbul to the district of Gebze in the neighboring province of Kocaeli in 105 minutes. Between 11 p.m. and 6 a.m., freight trains will be able to use the Marmaray lines.

The Marmaray tube tunnels are now the deepest submerged tubes in the world, at a depth of 60 meters. A tube in San Francisco Bay held the record before at 45 meters.