The foundation stone of the bridge was laid in 1998 during current Prime Minister Recep Tayyip Erdoğan's time as İstanbul mayor. It was halted by the municipality in 2003 when a World Heritage committee report brought up concerns that the bridge would harm the visual integrity of the historical peninsula and, in particular, the setting of the Süleymaniye Mosque.

After the project was revised by the municipality in a way that the bridge would not have a negative visual impact and the design was approved by the UNESCO committee, a tender for construction was held and construction has resumed. A joint bid from Turkey's Gülermak and Italy's Astaldi won the tender to construct the bridge, which was originally designed by architect and current İstanbul Mayor Kadir Topbaş. The construction of the bridge is expected to be completed by 2010.

The project includes the construction of a 387-meter-long steel cable-stayed bridge and a 120-meter-long swing bridge, which will open to allow access for shipping.YASIN KILIÇ İSTANBUL